S.N. | Office | Tender/Prequalification Notice | Status | Close Date |
---|---|---|---|---|
136 | 220kV Chilime-Trishuli Transmission System Project Chilime-Trishuli 220kV Transmission Line Project (Package 1) |
The Nepal Electricity Authority (“the Employerâ€) invites sealed bids from eligible bidders for the design,
supply, construction and commissioning of the 220 kV Chilime Hub – Trishuli-3B Hub Transmission
Line.
Download Supportive Documents :1. Tender Notice 2. Package 1 TL 3. Amendment-I |
2017-05-25 | |
137 | 220kV Chilime-Trishuli Transmission System Project Chilime Hub GIS New Substation and Trishuli-3B Hub AIS New Substation (Package 2) |
The Nepal Electricity Authority (“the Employerâ€) invites sealed bids from eligible bidders for the design,
supply, construction and commissioning of the 220/132/33kV Chilime Hub GIS New Substation (Part-I)
and 220(Hybrid)/132/33kV Trishuli-3B Hub AIS New Substation (Part-II).
Download Supportive Documents :1. Tender Notice 2. Package 2 SS 3. Amendment-I |
2017-05-25 | |
138 | Planning and Technical Services Department, Distribution System Rehabilitation Project (Rehabilitation of Existing 33/11 kV Substations) |
The Government of Nepal has allocated funds towards the cost of Rehabilitation of existing 33/11 kV Substations and Nepal Electricity Authority intends to apply part of the funds to cover eligible payments under the Contract for ICB/PTSD/2073/074-01"Rehabilitation of Existing 33/11 kV Substations." Bidding is open to all eligible Nepalese and Foreign Bidders.
Download Supportive Documents :1. Volume I 2. Volume II 3. Volume III |
2017-02-28 | |
139 | MARSYANGDI CORRIDOR 220 kV TRANSMISSION LINE PROJECT |
Procurement of Plant for Udipur-Markichowk-Bharatpur 220 kV Transmission Line (Design, Supply and Install) Single-Stage, Two-Envelope Bidding Procedure
Loan No: FIN 84.065 SERAPIS No. 2013-0599
Invitation for Bids No.: ICB-PMD-MCTLP-016/17-01
Download Supportive Documents :1. Volume I 2. Volume II (Sec 12) 3. Volume III (Cover) 4. Volume III 5. Volume II (Sec 1-11) 6. Addendum I 7. Amendment I 8. Clarification I |
2017-01-15 |