| S.N. | Office Name | Tender No. | Tender Name | Tender/Prequalification | Status | Close Date |
|---|---|---|---|---|---|---|
| 1 | Project Management Directorate, Hetauda-Parwanipur-Pokhariya 132 kV Transmission Line Project | PMD/PTDSSP/HPP/2079/80-02 | Piluwa - Parwanipur 132 kV Transmission Line Upgradation Work | First Date of Publication: 16 March, 2023 Loan No. and Title:3943-NEP: SASEC Power Transmission and Distribution System Strengthening Project Contract No. and Title:PMD/PTDSSP/HPP/2079/80-02:Piluwa - Parwanipur 132 kV Transmission Line Upgradation Work Deadline for Submission of Bids:16 May, 2023, 12:00 Hours (Nepal Standard Time) Download Supportive Documents : |
2023-05-26 | |
| 2 | Transmission Directorate, Grid Operation Department | Re-GOD/2078/079-14 | PROCUREMENT OF SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF POWER TRANSFORMERS AT VARIOUS SUBSTATIONS | PROCUREMENT OF SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF POWER TRANSFORMERS AT VARIOUS SUBSTATIONS Issued on: March 2023 Invitation for Bids No: Re-GOD/2078/079-14 Contract Identification No: Re-GOD/2078/079-14 Employer: Nepal Electricity Authority, Grid Operation Department Min Bhawan, New Baneshwor, Kathmandu, Nepal Tel.: +977 (01) 4106919, 4106782, 4106965 Electronic mail address: gridoperation@nea.org.np Financing Agency: Government of Nepal and Nepal Electricity Authority Download Supportive Documents : |
2023-04-23 | |
| 3 | Distribution and Consumer Services Directorate, Nepal Distribution System Upgrade and Expansion Project (AIIB) | ICB-DCSD-2078/79-DSUEP-AIIB-W4 | Procurement of material, equipment, associated accessories and necessary installation services including design, erection, testing and commissioning of 33/11 kV Substations and 33 kV, 11 kV, | First Date of Publication: 03 February 2023 Loan No. and Title: L-0086A, Nepal Distribution System Upgrade and Expansion Project Contract No. and Title: ICB-DCSD-2078/79-DSUEP-AIIB-W4, Procurement of material, equipment, associated accessories and necessary installation services including design, erection, testing and commissioning of 33/11 kV Substations and 33 kV, 11 kV, 400 V Lines, and Distribution System Network – Package No. AIIB-W4 Deadline for Submission of Tenders: 22 March 2023 at 12:00 hours (Nepal Standard Time) Download Supportive Documents : 1. IFT Notice 8. Minutes of Pre-Tender Meeting and Clarification I 9. Addendum I |
2023-03-31 | |
| 4 | Distribution and Consumer Services Directorate, Nepal Distribution System Upgrade and Expansion Project (AIIB) | ICB-DCSD-2078/79-DSUEP-AIIB-W5 | Procurement of material, equipment, associated accessories and necessary installation services including design, erection, testing and commissioning of 33/11 kV Substations and 33 kV, 11 kV, | First Date of Publication: 26 January 2023 Loan No. and Title: L-0086A, Nepal Distribution System Upgrade and Expansion Project Contract No. and Title: ICB-DCSD-2078/79-DSUEP-AIIB-W5, Procurement of material, equipment, associated accessories and necessary installation services including design, erection, testing and commissioning of 33/11 kV Substations and 33 kV, 11 kV, 400 V Lines, and Distribution System Network – Package No. AIIB-W5 Deadline for Submission of Tenders: 13 March 2023 at 12:00 hours (Nepal Standard Time) Download Supportive Documents : 1. IFT Notice 2. Vol I of III 8. Minutes of Pre-Tender Meeting & Clarification I and Addendum I |
2023-03-13 | |
| 5 | Transmission Directorate, Lekhnath Damauli 220 kV Transmission Line Project | 2016 67 773 | Project Name: Lekhnath Damauli 220 kV Transmission Line Project | First Date of publication: 13 Sept 2022 (GTAI, Germany), 14 Sept 2022 (Nepal) Project Name: Lekhnath Damauli 220 kV Transmission Line Project BMZ No.: 2016 67 773 Bid Submission Deadline: 14 November 2022, 12:00 noon (Nepal Time) Contract Identification No: ICB/NEA/LD220KVTLP/Package-A Download Supportive Documents : 4. Package_A_OHL_Part_2_VII-7_Annex_A 5. Package_A_OHL_Part_2_VII-7_Annex 7. Amendment I 9. Addendum II 10. Clarification II 11. Annex R IEE Lekhnath Damauli 12. Annex S Updated IEE Report Lekhnath Damauli 13. Addendum III 14. Addendum IV |
2023-01-12 |
Maintenance Schedule
Close-
टाडी चोक, कालिका पम्प , बकुलहर रत्न नगर अस्पताल रोड़, सुब्बा चोक , नेपाल मा.बि. स्कुल रोड़, अमेलिया , बैरिया, जय मंग्गला , जिरौना , पदमपुर र आसपासका क्षेत्र
Tandi Distribution Center From 2026-08-15 09:00:00 - 2026-08-15 17:00:00 -
जोरपाटी चोक देखि बेशिगांउ हुँदै भेनस स्कुल सम्म नारायणटार देखि सर्वेश्वर गेट सम्म
Chabahil Sub Distribution Center From 2026-08-15 11:00:00 - 2026-08-15 14:00:00 -
चावहिल चोक, चुच्चेपाटि, टुसाल, बौद्ध,हुँदै जोरपाटी चोक सम्म
Chabahil Sub Distribution Center From 2026-08-15 11:00:00 - 2026-08-15 14:00:00 -
कालिगण्डकी गाउँपालिका–५, स्याङ्जा अन्तर्गत नयाँमिल, बलानताँप, लिहाक र इम्सिल लोडसेन्टर
Syangja Distribution Center From 2026-08-14 09:00:00 - 2026-08-15 17:00:00 -
दुप्चेश्वर गा.पा. वडा नं. १, घ्याङफेदी, कुतुङखोला, नेगी, घ्याबरचौर, सिसिपु, तालुक, कसेरी का स्थानहरू,
Nuwakot Distribution Center From 2026-08-15 07:00:00 - 2026-08-15 15:00:00