ENVIRONMENTAL AND SOCIALMANAGEMENT PLAN OF GRID TIED SOLAR POWER PROJECT, BLOCK NO. 1, NUWAKOT (5.1MW)

Updated Date : 2018-02-14
The project site Block No 1; Raatmatey and Keraghari area of Devighat powerhouse (PH), is selected for installation of PV solar farmhouse with a capacity of 5.1MW.The project site is located at Keraghari and Raatmatey area of Bidur Municipality-6(the then Charghare VDC) of Nuwakot district. The name of the settlement around the project area is Multhala settlement.A total of 7.57ha land will be required for the project, which is already owned by NEA for the construction of Devighat Hydro power project in FY 2036/37 (1984 AD).